SPACE PHOTOS

Estimate Request for the image S10850

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S10850

Theme :  Testings - Satellites - Probes - Rockets  (2314 images)

Title : Workers prepare to close the payload bay doors of the Space Shuttle Atlantis in

Caption :

(09/19/1997) --- Workers prepare to close the payload bay doors of the Space Shuttle Atlantis in preparation for the planned Sept. 25 liftoff of Mission STS-86. The primary payload is the SPACEHAB Double Module, at center, which will be used mainly as a large pressurized cargo container for the three-and-a-half tons of science/logistical equipment and supplies to be exchanged between Atlantis and the Russian Space Station Mir. STS-86 will be the seventh docking of the Space Shuttle with the Mir. The 10-day flight also is scheduled to include the transfer of the sixth American to live and work aboard the Russian orbiting outpost. Liftoff of Atlantis and its seven-member crew is targeted for 10:34 p.m. EDT from Launch Pad 39A



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :