Enregistrez gratuitement cette image en 800 pixels pour usage maquette (click droit, Enregistrer l'image sous...)
|
|
Réf : S05275
Thème :
Astronautes Entrainement (1725 images)
Titre : The STS97 crew poses on the 215foot level of the Fixed Service Structure during
Description : (La description de cette image n'existe qu'en anglais)
(11/08/2000) --- The STS-97 crew poses on the 215-foot level of the Fixed Service Structure during Terminal Countdown Demonstration Test activities that include emergency egress training, familiarization with the payload and a simulated launch countdown. From left, they are Mission Specialist Carlos Noriega, Commander Brent Jett, Pilot Mike Bloomfield, and Mission Specialists Marc Garneau and Joe Tanner. Mission STS-97 is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST
|
|