SPACE PHOTOS

Estimate Request for the image S02619

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S02619

Theme :  Space Shuttle - General  (1045 images)

Title : STS-70 Rollout

Caption :

The Crawler Transporter brings the Space Shuttle Discovery on its Mobile Launcher Platform into position at Launch Pad 39B, following rollout from the Vehicle Assembly Building. The Fixed Service Structure and the Rotating Service Structure, permanent parts of the launch pad, are left of the Shuttle. Discovery and its crew of five are targeted for a June 8 liftoff on a satellite deployment mission, STS-70. Meanwhile, sister ship Atlantis is poised for launch from Pad 39A on a mission to rendezvous and dock with the Russian Mir Space Station. Atlantis is scheduled to lift off on STS-71 no earlier than June 22.



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :